COMMERCIAL CASE STUDY

Office Refurbishment Flooring Project

Bristol Office Refurbishment 

Project Overview

Ransome Flooring Ltd was appointed to deliver a full flooring package as part of a commercial office refurbishment project in Bristol. Working alongside the main contractor and project team, we were responsible for supplying and installing flooring across multiple areas within a modern office environment.

The project required a high-quality finish, delivered within a tight programme and coordinated with other trades on site.

Scope of Works

The project included flooring installation across:

  • Open-plan office areas 
  • Meeting rooms and boardrooms 
  • Corridors and circulation spaces 
  • Breakout areas and staff zones 

We installed a combination of:

  • Carpet tiles for durability and flexibility 
  • LVT flooring in high-traffic areas

The Challenge

This project presented several key challenges:

  • A tight programme with fixed completion deadlines 
  • The need to coordinate with multiple trades on site 
  • Working within a partially occupied building 
  • Ensuring a consistent, high-quality finish ac

Our Approach

We worked closely with the main contractor and site team to ensure smooth delivery at every stage.

Our approach included:

  • Detailed planning and scheduling of works 
  • Phased installation to align with programme requirements 
  • Close coordination with other trades 
  • Clear communication with the project team 

We ensured all materials were installed in line with specification, maintaining both quality and consistency throughout the project.

The Result

The project was completed on time and to a high standard, meeting both the client’s expectations and the requirements of the wider project team.

The finished space provided:

  • A clean, modern and professional working environment 
  • Durable flooring suitable for high footfall 
  • A consistent finish across all areas 

Client Outcome

The client benefited from:

  • Reliable delivery within programme 
  • High-quality workmanship 
  • Minimal disruption during installation 

Our structured approach ensured a smooth process from start to finish, contributing to the overall success of the refurbishment project.

Why It Matters

This project highlights our ability to:

  • Deliver flooring packages on commercial projects 
  • Work alongside contractors and project teams 
  • Maintain quality under tight deadlines